Adinyira, E, Manu, P, Agyekum, K, Mahamadu, A and Olomolaiye, P O (2020) Violent behaviour on construction sites: structural equation modelling of its impact on unsafe behaviour using partial least squares. Engineering, Construction and Architectural Management, 27(10), 3363–93.

Aghimien, D O, Aigbavboa, C O and Oke, A E (2020) Critical success factors for digital partnering of construction organisations – a Delphi study. Engineering, Construction and Architectural Management, 27(10), 3171–88.

Ahiaga-Dagbui, D D, Tokede, O, Morrison, J and Chirnside, A (2020) Building high-performing and integrated project teams. Engineering, Construction and Architectural Management, 27(10), 3341–61.

Alleman, D and Lee, E (2020) Mitigating the legal challenges of imposing disincentives on nonperforming transportation projects. Engineering, Construction and Architectural Management, 27(10), 2859–91.

Arbabi, H, Salehi-Taleshi, M and Ghods, K (2020) The role of project management office in developing knowledge management infrastructure. Engineering, Construction and Architectural Management, 27(10), 3261–87.

Bevan, W, Lu, S and Sexton, M (2020) Skills required to deliver energy efficient school retrofit buildings. Engineering, Construction and Architectural Management, 27(10), 3051–73.

Huynh, T T, Dang, C N, Le-Hoai, L, Pham, A and Nguyen, T D (2020) Proposing a strategy map for coastal urban project success using the balanced scorecard method. Engineering, Construction and Architectural Management, 27(10), 2993–3030.

Irfan, M, Malik, M S A and Kaka Khel, S S U H (2020) Effect of factors of organizational structure influencing nonphysical waste in road projects of developing countries. Engineering, Construction and Architectural Management, 27(10), 3135–53.

Kim, S Y, Nguyen, M V and Luu, V T (2020) A performance evaluation framework for construction and demolition waste management: stakeholder perspectives. Engineering, Construction and Architectural Management, 27(10), 3189–213.

Lin, Y, Guo, Y, Kim, C, Chen, P and Qian, M (2020) The impact of relational governance on the adaptability of international contractors: a comparative study between China and Korea. Engineering, Construction and Architectural Management, 27(10), 3235–59.

Liu, B, Xue, B, Meng, J, Chen, X and Sun, T (2020) How project management practices lead to infrastructure sustainable success: an empirical study based on goal-setting theory. Engineering, Construction and Architectural Management, 27(10), 2797–833.

Loosemore, M, Higgon, D and Osborne, J (2020) Managing new social procurement imperatives in the Australian construction industry. Engineering, Construction and Architectural Management, 27(10), 3075–93.

Olanrewaju, O I, Chileshe, N, Babarinde, S A and Sandanayake, M (2020) Investigating the barriers to building information modeling (BIM) implementation within the Nigerian construction industry. Engineering, Construction and Architectural Management, 27(10), 2931–58.

Oshodi, O, Edwards, D J, lam, K C, Olanipekun, A O and Aigbavboa, C O (2020) Construction output modelling: a systematic review. Engineering, Construction and Architectural Management, 27(10), 2959–91.

Song, Z, Yang, F, Boezeman, E J and Li, X (2020) Do new-generation construction professionals be provided what they desire at work? A study on work values and supplies–values fit. Engineering, Construction and Architectural Management, 27(10), 2835–58.

Sun, C, Xu, H and Jiang, S (2020) Understanding the risk factors of BIM technology implementation in the construction industry: an interpretive structural modeling (ISM) approach. Engineering, Construction and Architectural Management, 27(10), 3289–308.

  • Type: Journal Article
  • Keywords: Building information modeling (BIM); Risk-factors; Interpretive structural model (ISM); Questionnaire survey;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-09-2019-0508
  • Abstract:
    The purpose of this paper is to identify risk factors in building information modeling (BIM) technology application, analyze the correlation between risk factors, and find the most influential risk factors using interpretative structural model (ISM), put forward a response to targeted suggestions, and provide a reference for widespread BIM technology application.Design/methodology/approach Literature reviews, ISM, a questionnaire survey and expert interviews were used in this paper. First, the risk factors of BIM technology application and their relationships were determined by consulting the relevant BIM literature. Second, to more intuitively reflect the relationships between risk factors, an ISM model based on expert interviews was established to structure the explanatory relationships and hierarchical relationships between factors. Finally, a questionnaire survey was conducted for relevant practitioners, and a scale was designed to evaluate the risk factors of BIM technology application to determine the risk factors that have a greater impact on implementing BIM technology.Findings The root risk factors of BIM technology consist of unclear data ownership, incomplete standard BIM systems, lack of industry insurance, lack of BIM technicians, lack of BIM project practice experience, BIM infrastructure preparation, inconsistent thinking about BIM from project participants, changes in delivery mode and software function problems.Research limitations/implications The risk-sharing of BIM technology and the analysis of responsibilities, rights and benefits of all parties in a BIM project can be used as future research directions to solve higher management problems.Originality/value This paper describes the risks of BIM technology application for related researchers and provides another research train of thought for the follow-up studies.

Sun, M, Zhu, F and Sun, X (2020) Influencing factors of construction professionals’ burnout in China: a sequential mixed-method approach. Engineering, Construction and Architectural Management, 27(10), 3215–33.

Türkakın, O H, Manisalı, E and Arditi, D (2020) Delay analysis in construction projects with no updated work schedules. Engineering, Construction and Architectural Management, 27(10), 2893–909.

Tong, R, Zhang, N, Wang, X and Zhao, H (2020) Impact of safety management system on safety performance: the mediating role of safety responsibility. Engineering, Construction and Architectural Management, 27(10), 3155–70.

Vahdatmanesh, M and Firouzi, A (2020) Construction material supply risk management using Asian option contracts: the case of a pipeline project. Engineering, Construction and Architectural Management, 27(10), 3395–414.

Wang, Y, Ye, G, Zhang, Y, Mu, P and Wang, H (2020) Total factor productivity growth and its contribution: lessons from the Chinese construction industry pre- and post-2008 financial crisis. Engineering, Construction and Architectural Management, 27(10), 2911–29.

Zhang, L, Dai, G, Zou, X and Qi, J (2020) Robustness-based multi-objective optimization for repetitive projects under work continuity uncertainty. Engineering, Construction and Architectural Management, 27(10), 3095–113.

Zhang, N, Hwang, B, Deng, X and Tay, F (2020) Collaborative contracting in the Singapore construction industry: current status, major barriers and best solutions. Engineering, Construction and Architectural Management, 27(10), 3115–33.

Zhang, Q, Chong, H, Liao, P and Wan, Y (2020) Logistic regression modeling of implementation of corporate safety policy in international infrastructures. Engineering, Construction and Architectural Management, 27(10), 3031–50.

Zhang, Y, Luo, W, Shan, M, Pan, D and Mu, W (2020) Systematic analysis of PPP research in construction journals: from 2009 to 2019. Engineering, Construction and Architectural Management, 27(10), 3309–39.